For a brief introduction of water Management in CBC, in 1980 PDOCHS became PDOHA and the CBC came into existence. In 1984 the water supply was handed over to CBC. In 1985 control was again taken –over by DHA. In 2009 water supply was again handed over to CBC.
CBC has adopted per capita demand as 30 GPD in calculating / supplying the water to the public. KW&SB (Karachi Water & Sewerage Board) provides water for CBC at the following location:
- Ghazi pumping station (Chakra Goth)
- Zamzama
As the Chakra Goth is almost 8 Km away from the main pumping station of CBC thus 2 x Water Supply lines having diameter 30” and 24” have been laid to transport water towards the said pumping station. Thereafter the water is pumped to different pumping stations through distribution lines having diameters 12”, 16” & 18” for further supply to the individual units.
The main issues currently being faced by CBC in respect of Water Management are:
- Gap in Demand & Supply
- Obsolete / Corroded Water Supply network
- Losses in water supply System
- Improvement in Management
AVAILABLE SOURCES
(BASIS – 30GPD/CAPITA)
| SOURCE | ALLOCATED MIGD | CURRENT SUPPLY MGD | ACTUAL REQUIREMENT MGD | DIFF MGD |
| KW & SB | 9 | 7.0 | - | - |
| COGEN | 2.4 | - | - | - |
| TOTAL | 11.4 | 7.0 | 11.52 | 4.52 |
STORAGE CAPACITY (MG)
| DETAILS | NOS | STORAGE CAPACITY | REQUIREMENT | DIFF |
| U/G TANK | 22 | 9.615 | 18 | 5.685 |
| O/H TANK | 18 | 2.700 | ||
| TOTAL | 40 | 12.315 | 18 | 5.685 |
![]() |
In order to redress the issues a strategic plan has been devised which includes short term, medium term and long term measures.SHORT TERM MEASUERS (30TH JUNE, 2011)
|
Replacement Plan
- 1 -Almost 70% of entire Water Supply network of CBC consists of hazardous AC lines.
- 2 -Most of these lines have been worn out and cause severe water losses.
- 3 -Replacement of these deteriorated lines is imperative in order to achieve the following:
-
- 1 -To minimize water losses in the system due to leakages.
- 2 -To prevent contamination.
- 3 -To maintain smooth / uniform flow.4 -To reduce bowzer load due to lines faults.
- 4 -To reduce bowzer load due to lines faults.
MEDIUM TERM MEASURES
(30TH JUNE, 2012)
- 2ND Phase of replacement of corroded lines will b implemented.
- Another RO Plant of appropriate capacity will be installed.
- DHA will probably be able to re-commission the Cogent plant.
LONG TERM MEASURES
(30. JUNE, 2013)
- 3RD (FINAL) Phase of replacement of lines will be implemented.
- RO Plant will further be added to augment the in take.
- DHA management will incessantly be approached to install Cogent - II.
- Enhancement of storage capacity.
LATEST DEVELOPMENT BY KW & SB (Karachi Water & Sewerage Board )
- KW & SB PROVIDES WATER AT Chakra through 2X.
- Transmission lines having dia 24'' & 12''
- Recently KW & SB has replaced 12'' dia line having length 60' by 16''dia.
- Such an increase of 4'' diameter will probably increase 1 MGD water.
After implementation of the strategic plan following improvements in water supply management Will be achieved:
- Water Losses will be considerably reduced and will save almost 1 MGD (approx) water.
- The gradual addition of RO Plants will supplement the intake.
- The monitoring of lowest tier of managerial staff will improve the distribution system as well as deter the staff extending illegal connection to the units.
- Re- functioning of Cogen plant will have a great relief to the public and management.
- Public complaints will be reduced considerably.

WATER SUPPLY SECTION
(Telephone Numbers)
| S/No | NAME | Designation | Sub Division | Mobile NO | Phone No (office) | Area |
| 1 | Hafeez uddin | Cantt.Engr | - | 0323-4737946 | 35847087 | All DHA Area including Katchi Abbadies |
| 2 | M.Amjad Jafri | A.E | Bowzer Section | 0322-2264667 | 35840817 | Bowzer Section |
| 3 | Syed Akhtar Hussain | A.E | Complaint Centre | 0334-3929729 | 35848543 | |
| 4 | Syed Asadullah | SDO | I | 0333-3542671 | 35890365 | Phase-I,II&Ext. |
| 5 | Hasan Akhtar | SDO | II | 0300-2168920 | 35835228 | Phase-IV, V (upto 21st Street). |
| 6 | Zafar KAmal Qutbi | SDO | III | 0321-9227976 | 35845229 | Phase-V (from 22nd Street to Beach Avenue & Zamzama Area. |
| 7 | Syed shakeel Ahmed Jafri | SDO | IV | 0332-3637970 | 35848473 | Phase-VI,VII,&VIII |
| 8 | Imran khan | Sub Engineer | Bulk Water Supply | 0321-9264215 | 35840850 | Bulk water Supply |
| 9 | Badruzzama khan | Supdt | Main Office | 0333-3423023 | 35847831 | - |
Filtration Plants Location
| S# | Location |
| 1 | Water purification plant No.1 at main Beach view |
| 2 | Water purification plant No.2 at Kh-e-Sehar |
| 3 | Water purification plant No.3 at 34th Street off Kh-e-Bahria |
| 4 | Water purification plant No.4 at 3rd Zamzama Street |
| 5 | Water purification plant No.5 at 13th Street off Kh-e-Rahat |
| 6 | Water purification plant No.6 at Kh-e-Jabal |
| 7 | Water purification plant No.7 at Dehli Colony |
| 8 | Water purification plant No.8 at Kh-e-Jami (Punjab Colony) |
| 9 | Water purification plant No.9 at Kala Pul |
| 10 | Water purification plant No.10 at 2nd North Street (Multani Park) Ph-I |
| 11 | Water purification plant No.11 at 2nd South Street (South Park) Ph-II |
| 12 | Water purification plant No.12 at 15th Comm. Street Ph-II Ext |
| 13 | Water purification plant No.13 at main Kh-e-Saadi |
| 14 | Water purification plant No.14 at 10th Comm. St. Ph-IV |
| 15 | Water purification plant No.15 at main Gizri |
| 16 | Water purification plant No.16 at P&T Colony |
| 17 | Water purification plant No.17 at Askari Appartment Ph-I |
| 18 | Water purification plant No.18 at Jamuria Colony |
| 19 | Water purification plant No.19 at 12th South Street |
| 20 | Water purification plant No.20 at Defence Garden |
Slideshows can
be opened in latest editions of Microsoft Office PowerPoint
or in PowerPoint Viewer.
| S.No | Name | Download |
| 1 | Water Supply Bulk Network | |
| 2 | Katchi Abadies Water Supply |