For E-Complaint: e-cc@cbc.gov.pk
Hot line: 021-35847831-32-35
Toll Free: 0800-13520










Engineering Branch

                                                             


  Head:  Chief Engineer
    Mr. Abu Hanifa Saadi
   M.Sc (Engg) Civil
   B.Sc (Engg) Civil

   email: cce@cbc.gov.pk

Function

Engineering branch becomes active when there is any new work application or complaint from the people living in the CBC boundary and from higher officials of CBC about road, street light, sewerage, water connection or any other work comes under the scope of engineering branch. It is responsible for building and maintenance of roads, water supply, sewerage, streetlights, fountains and road signals. This branch proposed new projects for the improvement of the cantonment and providing facilities for the residents. This branch carries out the following main activities.

  • Water New Connection
  • Water Disconnection
  • Water Reconnection
  • Sewerage New Connection
  • New Work Execution
  • New Work Project
  • New Project Allotment
  • Project Payment
  • Project Completion
  • Small Project
  • Road Maintenance Work
  • Other Maintenance Work
  • Routine Repair Work
  • Application about Problems
  • Budgeting
  • Street Light Management
  • Fountains Management

 

 

                                       LIST OF OFFICIALS IN ENGINEERING BRANCH

S.NO NAME & Designation Area
1 Mr. Abu Hanifa Saadi

 Cheif Engineer

Over all Incharge Engineering Branch.
2 Syed Ghulam Abid Shah

Senior Engineer, 0345-5094101

Overall Engineering Works, Building Cell.
3 Mr. Hafeez-uddin

Cantt Engineer, 0321-8035497

Water Supply all works.
4 Syed Ronaq Abbas Zaidi

Assistant Engineer, 0300-5456639

Phase-V, & V Ext.
5 Muhammad Rasheed

Assistant Engineer, 0300-2103774

Phase-VI, Building Cell
6 Arshad Jameel

Assistant Engineer, 0300-2317852

Water Supply all works.
7

Muhammad Anwar

Assistant Engineer,0321-2507942

Phase-VIII, VII Ext, Phase-IV, Road Patch Work.
8 Syed Mumtaz Haider Zaidi

Assistant Engineer, 0321-2459886

Phase-I, II, II Ext, Block- 8 & 9, Katchi Abadis.
9 Khalid Mehmood

Cantt. Overseer, 0333-3601347

Phase-I, II, II Ext, Block- 8 & 9, Katchi Abadis.
10 Arshad Usmani

Cantt Overseer, 0321-8255733

Phase-V
11 Mr. Ahmer Usmani

Cantt. Overseer, 0333-3798229

Water Supply works.
12 Syed Jazib Hussain Shah

Cantt. Overseer, 0333-3798229

Phase-VII, VII Ext Road Patch work.
13 Muhammad Awais

Cantt. Overseer, 0333-6965545

Phase-V Ext.
14 Waseem Abbas

Cantt. Overseer, 0300-8175695

Phase-VI
15 Muhammad Mithal

Cantt. Overseer, 0333-2892684

Phase-IV
16 Muhammad Asif

Cantt. Overseer, 0322-3111190

Electrical work.


PROPOSED ORIGINAL WORKS (2011-2012)

S# Description Est. Cost (M)
 

Building.

 
(i) Construction of CBC Health Center in Bazar Area 20.00
(ii) Construction of new block in CBC Health Center Ph-II 10.00
(iii) Reconstruction of sump pump in CBC / DHA 35.00
    65.00
 

ROADS

 
  Group -  A  
(i) Widening/Re-carpeting of 2nd Comm. Lane from Comm. Ave to 11th Comm Street,Ph-IV 2.09
(ii) Widening/Re-carpeting of 4th Comm. Lane from Comm. Ave to 11th Comm Street,Ph-IV 2.34
(iii) Widening/Re-carpeting of 5th Comm. Lane from Comm. Ave to 11th Comm Street,Ph-IV 2.24
(iv) Upgrading/Re-carpeting of link streets between 9th & 10th Commercial Street Phase-IV 1.70
    8.37
  Group -  B  
(i) Re-carpeting of Road along with side drain on 3rd Commercial Street Phase-IV 6.68
  Group   C  
(i) Widening/Re-carpeting of  Street Between Kh-e-Shaheen & 26th St. Ph-V 5.78
(ii) Widening/Re-carpeting of B-I Street Between Kh-e-Ghazi & 5th Street  Ph-V 1.74
    7.52
  Group -  D  
(i) Widening/Re-carpeting of Street from Kh-e-Hafiz to Kh-e-Shaheen Ph-V 1.96
(ii) Widening/Re-carpeting of 18th Street Off Kh-e-Bad ban Phase-V 1.93
(iii) Widening/Re-carpeting of 19th Street Off Kh-e-Bad ban Phase-V 1.93
(iv) Re-carpeting of 20th Street Off Kh-e-Tanzeem Phase-V 2.68
(v) Widening/Re-carpeting of 8th Street of Zamzama Phase-V DHA Karachi 2.58
    11.08
  Group  - E  
(i) Widening/Re-carpeting of 5th St. from Kh-e-Momin to B-I St. Ph-V 3.34
(ii) Widening/Re-carpeting of 6th St. from Kh-e-Momin to B-I St. Ph-V 1.34
(iii) Re-carpeting of 7th St. from Kh-e-Momin to B-I St. Ph-V 1.30
(iv) Widening/Re-carpeting of 8th St. from Kh-e-Momin to B-I St. Ph-V 2.06
(v) Widening/Re-carpeting of 6th St. from Kh-e-Bad ban to B-2 St. Ph-V 1.73
(vi) Widening/Re-carpeting of Kh-e-Jabal from Japan consulate to Kh-e-Ghazi 2.14
    11.91
  Group  - F  
(i) Upgrading Re-carpeting of D St. from Kh-e-Tanzeem to B.No.D-I Ph-V 3.04
(ii) Widening/Re-carpeting of 22nd St. from Kh-e-Mujahid to Kh-e-Bad ban 3.69
    6.73
  Group -  G  
(i) Up-grading/ re-carpeting of Streets/lanes (50) in Badar Comm. Area Ph-V Ext 21.00
  Group -  H  
(i) Widening/Re-carpeting of 27th Street Between Kh-e-Mujahid & Kh-e-Shams her Ph-V Ext 1.38
(ii) Re-carpeting of Roads in Block Nos1,2,3 & 4 Sea view Apartment Phase-V Ext 2.33
(iii) Re-carpeting of Roads in Block Nos12,13,14,& 15 Sea view Apartment Phase-V Ext 1.79
(iv) Re-carpeting of Roads in Block Nos23,24,25 & 26 Sea view Apartment Phase-V Ext 2.62
    8.12
  Group  -  J  
(i) Improvement of 4th Street from Kh-e-Bokhari to Rahat Comm. Ph-VI 6.40
  Group -  K  
(i) Widening of 23rd & 25th Street between Kh-e-bokhari & Kh-e-Muhafiz Ph-VI 4.00
  Group -  L  
(i) Improvement of road and center median on Kh-e-Ghazi from Kh-e-Sehar to Kh-e-Rahat & Kh-e-Bukhari to Kh-e-Ittehad Phase-VI 9.50
  Group -  M  
(i) Improvement / raising of 4th,5th & 6th lane between Kh-e-Badar & Kh-e-Hilal  Ph-VI 4.96
(ii) Improvement of road and center median on Kh-e-Rahat from 5th Street to popular Avenue Ph-VI 2.50
(iii) Improvement of road and center median on Kh-e-Badar from Comm. Avenue to 2nd Street & 4th Street to 7th Street Phase-VI 2.00
(iv) Re-carpeting of 3rd Street  Between Kh-e-Badar & Kh-e-Hilal Ph-VI 2.00
    11.46
  Group -  N  
(i) Widening/Re-carpeting of Kh-e-Saadi Phase-VII 7.50
(ii) Widening/Re-carpeting of Street Between Kh-e-Rahat & Kh-e-Sehar Ph-VII 4.68
    12.18
  Group  -  O  
(i) Widening/Re-carpeting of road from French Culture Center to Kh-e-Jami Block-8 2.00
(ii) Re-carpeting of road in Naval Housing Scheme at Block-9 8.00
    10.00
  Group  -  P  
(i) Improvement of main road at Jamhoria Colony 2.00
  Group  -  Q  
(i) Re-carpeting of St No.1 area Hazara Colony 1.25
  Group - R  
(i) Re-carpeting of road from D-14 to Kh-e-Iqbal Super Market Block-9 and Service road Block-936 2.25
  Group - S  
(i) Re-carpeting of road from Water Supply pumping station to Iqbal Manzil at Bukshan Village 2.25
    142.70
(vii) Proposed reduction of Footpath on either side on 5th Street from Kh-e-Sehar to Kh-e-Ittehad Ph-VI 1.950
(viii) Proposed reduction of Footpath on either side on 26th Street from 7-A St. to Kh-e-Badar Ph-V Ext 0.385
    9.60
  Group -  F   
(i) Providing laying 50mm thick paving stone at Dehli Colony No.1 1.50
(ii) Construction of Bridge at Nehr-e-Khyam in Comm. Area 1.00
(iii) Imp. of football ground /construction of boundry wall and steps Lower Gizri 2.50
(iv) Construction of Bridge across Nehr-e-Khyam Block-9 Clifton Cantt. 0.800
    5.85
    29.97
  GRAND TOTAL 373.340


 S# SEWERAGE  
  GROUP-A  
(i) Replacement of existing 300 mm dia sewerage line on sunset Street Between 8th Sunset 1.90
   street to Korangi Road Ph -II Ext.  
(ii) Providing laying of Nullah Slab on South Park Avenue Ph-II Ext 1.34
    3.24
  GROUP-B  
(i) Proving\laying R.C.C Slab on Nullah on Ch. Khalique-Uz-zaman Road 5.00
    8.24
  WATER SUPPLY  
  GROUP-1  
(i) Laying of Water  supply line 4'' dia PE Pipe at 6 sunset St from sunset Boulvd to 3sunset St, Ph-ii Ext 0.89
(II) Replacement of 4'' dia AC Pipe with 6" dia PE on Central Area from Abu Bakar Mosque to 12 Central Street, 1.85
  ph -ii  
(iii) Replacement of 4'' dia AC Pipe with 4" dia PE pipe 9th Central Street from cetral Ave to lodge st,ph -ii 0.93
(iv) Replacement of 4'' dia AC Pipe with 4" dia PE on Kh-e-jami from South Park Avenue to Kh-e-Ittehad . 1.28
(v) Replacement of 4" dia AC Pipe with 4" dia PE pipe on old Sunset Boulvd from sailor st to Central Ave 1.43
    6.38
  GROUP-2  
(I) Laying of Water Supply  line 6" dia G.i. Pipe at 1 South Street over head tank,Ph-ii. 0.59
(ii) Laying of Water Supply  line 6" dia PE pipe at Sunset ST from 4 Sunset st to Kh-e-Jami Ph-ii Ext 1.07
(iii) Laying of Water Supply  line 6" dia PE Pipe at 4 Sunset St , from pase II Ext Pump House to Sunset Avenue 4.41
  Ph-ii Ext.  
IV) Replacement of 6" dia GI Pipe with 6" dia GI Pipe on 15 Comm Street from Ph -ii Ex Pump House 0.76
  to Overhead Tank.  
(V) Replacement of 6" dia AC Pipe with 6" dia PE Pipe on 12 Comm Street from 15 Comm Street to Kh-e-Jami 1.28
(vi) Replacement of 6" dia AC Pipe with 6" dia PE Pipe on 9 Central Street from Sailor Street to lodge St and 1.49
  hospital St Ph-ii  
    9.60
  GROUP-3  
(i) Replacement of 12'' dia Gi Pipe with 12" dia PE Pipe on South Circular Ave from South Seaview Ave to 14.00
  12 South Street, Ph-ii.  
  GROUP-4

 

(i) Laying of Water Supply line 4" dia PE Pipe at 1 Comm St from 4 Comm Lane to 7 Comm Lane,Ph-iv. 1.77
(ii) Laying of Water Supply line 4" dia PE Pipe at 2 Comm St from 4 Comm Lane to 7 Comm Lane,Ph-iv. 1.77
(III) Laying of Water Supply line 4" dia PE Pipe at 3 Comm St from 4 Comm Lane to 7 Comm Lane,Ph-iv. 1.70
(iv) Laying of Water Supply line 4" dia PE Pipe at Gizri Boulvd & Gizri Avenue from House. 0.89
     
  GROUP- 5  
(i) Laying of Water Supply line 12'' dia PE pipe at kh-e-badr from kh-e- Hafiz to Kh-e- Shujaat , Ph- v. 22.094
     
  GROUP- 6  
(i) Laying of Water Supply line 4'' dia PE Pipe at 32 street from Kh-e-Bahria to Kh-e-Sehar, Ph-vi. 1.18
(ii) Laying of Water Supply line 4'' dia PE Pipe at 32 street from Kh-e-Bahria to Kh-e-Sehar, Ph-vi. 1.3
(iii) Laying of Water Supply line 4'' dia PE Pipe at 26 street from Kh-e-Shamsheer to B street , Ph-vi. 1.35
(iv) Laying of Water Supply line 4'' dia PE Pipe at Ittehad from 34 street to Shujaat  , Ph-vi. 2.27
(v) Laying of Water Supply line 4'' dia PE Pipe at Saba Avenue from B Street to Behria , Ph-v. 1.26
(vi) Laying of Water Supply line 4'' dia PE Pipe at Muslim from Saba Avenue to 22 Street , Ph-vi. 1.73
    9.09
  GROUP-7  
(i) Laying of Water Supply line 10'' dia PE Pipe at Saba Avenue From Sehar to Badar. 5.38
  GROUP-8  
(i) Laying of Water Supply line 12'' dia PE Pipe at 3 Zamzama Street from Underground Tank to Zamzama Boulvd, 14.66
     
  GROUP-9  
(i) Replacement of Water Supply line 4'' dia PE Pipe at 3Lane from Badar to Hilal 0.97
(ii) Replacement of Water Supply line 4'' dia PE Pipe at 4 St from Rahat to Muhafiz 0.97
(iii) Laying of Water Supply line 4" dia PE pipe at Sahar lane -3 1.24
(iv) Replacement of water Supply line 4" dia (110mm) PE pipe at Saadi from 12th Lane to Ayesha Masjid 1.7
(v) Replacement of water Supply line 4" dia (110mm) PE pipe at Saadi from 12th Lane to Popular Avenue. 1.7
    6.58
  GROUP-10  
(i) Replacement of Water Supply line 6'' dia PE Pipe at Jami Nala from 26 Lane to Golf Rd-3 1.00
(ii) Laying of Water Supply line 6" dia PE Pipe at 20' wide Rd WW-1 from 17 lane to 20 lane. 0.93
(iii) Replacement of Water Supply line 6'' dia PE pipe at Badria Both Side from 15 lane to 21 lane. 2.6
(iv) Laying of Water Supply line 6" dia PE Pipe at Rizwan from link Road Ittehad to Police Station. 0.8
(v) Laying of Water Supply line 6" dia PE Pipe at Mehfooz Shaheed from Rizwan to Sadi. 0.8
(vi) Laying of Water Supply line 6" dia PE Pipe at Tuffail Shaheed from Rizwan to Ittehad. 0.86
GROUP-11
(I) Laying of water supply line 6'' dia PE Pipe at Zulfiqar St.1 from Kh-e-Ittehad to Marina Club. 2.97
(ii) Laying of water supply line 6'' dia PE Piple at Commercial Avenue from Muhafiz to Rizwan 2.12
(iii)

Replacement of 6'' dia AC Piple with 6'' dia PE Pipe on 20' wide Road Bukhari Commercial from

16 Street to Kh-e-Shujaat. 

1.81
  Group - 12  
(i) Laying of water supply line 10" dia PE pipe at Kh-e-Hafiz from KH-e-Rahat to Kh-e-Badar. 5.23
(ii) Laying of water supply line 10" dia PE pipe at Kh-e-Shaheen from rahat to Kh-e-Shahbaz,Ph-VI. 3.61
    8.84
  Group - 13  
(i) Replacement of water supply line with 6" dia PE pipe Nishtar Road,Punjab Colony. 1.5
(ii) Improvement of water supply line with 4" dia PE pipe from pumping station to St-21, Punjab Colony. 2
(iii) Construction of 2x Water Filtration Plants in Bazar Area, CBC. 3.5
    7.00
    127.43
  MISC: PUBLIC IMPROVEMENT  
  Group - A  
(i) Improvement of various chowks in phase-I, II & II-Ext 2.00
  Group - B  
(i) Construction of Foot-Path at 4th Commercial Lane from Commercial Avenue to 10th Commercial Street Ph-IV 1.39
(ii) Construction of Foot-Path at 3rd Commercial Lane from 5th Commercial Avenue to 11th Commercial Street
1.53
  Ph-IV. 2.92
  Group-C  
(i) Improvement of various Chowks in Ph-V & V-Ext 2.00
(ii) Construction of Centre Madian on Kh-e-Badar from Commercial Avenue to Kh-e-Hafiz Ph-V 2.00
    4.00
  Group -D  
(i) Re-construction of Centre Median at Kh-e-Nishat from Kh-e-Shahbaz to KH-e-Hjafiz Ph-VI 1.65
(ii) Const. of Centre Media on Popular Ave. Ph-VI 2.00
(iii) Improvement of variou chowks in Ph-VI 2.00
    5.65
  Group - E  
(i) Proposed reduction of median on either of road on Kh-e-Sehar from 10th Street to Beach Avenue ,Ph-VI,DHA 3.60
(ii) Proposed  reduction of Footpath on Kh-e-Shamsheer from Kh-e-Shujaat to Saba Ave.Ph-V & V-Ext 1.27
(iii) Proposed reduction of Footpath on "E" Street from 26th Street to Beach Ave. Ph-V Ext 0.930
(iv) Proposed reduction of Footpath on Saba Ave.from "B" St. to Kh-e-Sehar Ph-V Ext 0.285
(V) Proposed reduction of Footpath on Saba Ave.from Kh-e-Rahat to Kh0e-Muhafiz Ph-VI 0.476
(vi) Proposed Reduction to Median on "B" Street from Saba Avenue to Beach Ave.Ph-V Ext 0.710


Annex - B

RECASTED ORIGNAL WORKS FOR THE YEAR 2010-2011
S# Description Est. Cost
(M)
  Roads D-1 (b)  
1 Improvement /widening of 15th Street from kh-e-Touheed to kh-e-Tanzeem Ph-V
DHA Karachi.
1.536
2 Improvement /widening of 16th Street from Kh-e-Touheed to Kh-e-Tanzeem Ph-V
DHA Karachi.
1.536
3 Widening / Recarpeting of 17th street of  Kh-e-Badban Ph-V DHA. 1.820
4 Construction / Raising of back street B/W 7th & 7 A Street Ph-V Ext DHA. 0.580
5 Improvement / widening of popular Ave from Kh-e-Ittehad to Kh-e-RAhat Ph-VI
DHA Karachi.
4.974
6 Rehabilitation / Resurfacing of Kh-e-Shujat from Kh-e-Ittehad to Kh-e-Mohafiz Ph-VI DHA Karachi. 16.33
  Total:- 26.776
     
  Sewerage D-1 (c)  
1 P/L of sewerage line 400mm dia uPVC class (B) along Kh-e-sadi from 12th Lane to Kh-e-jami Ph-VII DHA , Karachi. 8.640
  Total:- 8.640
     
  Water supply Section D-1 (d)  
1 Installation of 02 Reserve Osmosis (RO) Plants in CBC area. 120.000
2 Water Supply networking in CBC area. 150.000
  Total:- 270.000
     
  Misc Public Improvement D-1 (f)  
1 Sea view central median
Supply and fixing of 105 street light pole double arms 12 Meter high hot dipped galvanized conical round / octagonal imported complete with 250 watt light supply and fixing (Imported) with following specification.
POLE
  • Bracket double arm, having minimum 4 meter projection.
  • Base plate with an axis between.
  • Anchor bolts with an axis between.
  • Connection box lockable (suitable for 1x250 watts lamps).
LIGHTS
  • Street light fixture imported 250 watts operating voltage 220/230 volts AC 50 HZ completes with SON-T lamp ballast, and capacitor housing and refection complete.
  • Reflector, adjustable reflector made in highly pure.
  • Aluminum, pressed sheet polished and oxidized.
  • Gasket, all gaskets are made in rubber, high.
  • Long and short arm adjust option (Down and side Entry).
CABLE
  • LT cables 600/1000 volts following sizes:-
  • 2.5mm 2 core CU/PVC (for junction box to light fixture).
  • 16mm 3 core CU/PVC/PVC/SWA/PVC (from pole to pole).
  • 70mm 4 core CU/PVC/SWA/PVC (for main supply) (approx).
  • Junction box is fitted with a front adjustable hook.
  • The supply cables in the bottom of the box are fastened.
AUTO SYSTEM
Standard suitable
15.00

 

Total:- 15.000


RECASTED ORIGNAL WORKS FOR THE YEAR 2010-2011(KATCHI ABADIS)

S# Description Est. Cost
(M)
1 Providing and laying pavers 50 mm thick in street colony at HAzara colony CBC area. 2.580
2 Construction of road for Foundation School to Korangi road sugnal Hazara Colony 4.850
3 Construction of road at Hazara Colony Tall Wali Gali. 1.400
4 Providing & Laying 100mm dia uPVC pipe at small galies at HAzara colony 1.720
5 Re-construction of roads at Chandio Village street. 3.490
6 Providing & laying of St. with pavers 50mm thick in 1,2,3,4,5,6,7 at Dehli colony No.2 5.060
7 Reconstruction of road at street No.1,2,3,4,5,6,7,8 at Dehli Colony No.1  3.900
8 Construction of road in new Basti at Dehli Colony No.3 1.960
9 Providing & Laying 100mm dia PVC pipe at Dehli Colony No.3 1.530
10 Replacement of damaged sewerage line 300mm dia at street No.4,5,6 Dehli Colony No.1 1.270
11 Construction of road for Fish Market to Askari Apartment Block-8 1.870
12 P/laying of damaged Sewerage dia 300mm dia at Service road Block-8  2.000
13 P/laying RCC pipe 300mm from Anti-Narcotic to Sump Pump Block-8 0.770
14 Construction of pavers 500mm thick in street at Pak Jamhuria Colony 2.610
15 Construction road for PNS Shifa Hospital to Foundation School Pak Jamhuria  Colony 4.010
16 Providing & Laying 100mm dia uPVC pipe at small gali at Pak Jamhuria Colony 2.250
17 Providing & Laying  pavers 50mm thick in small galies lower Gizri 1.650
18 Providing & Laying  100mm dia uPVC pipe in small gali at Lower Gizri 2.250
19 P/Laying of pavers 50mm thick in allied street No.20&21 and link street in Punjab Colony 1.750
20 Construction of road No.6,7,11,17,18,19,20 at Punjab Colony 5.550
21 Replacement of damaged sewerage line 300mm dia at street  No.2,3,5,6,8,10,11,12 Punjab colony 3.500
22 Providing & laying of water supply line 100mm uPVC from Water Supply tank to street No.19,20,21, Punjab Colony 1.170
23 P/laying pavers 50mm thick in small gali at Bukshan Village 2.800
24 Construction of road along football ground Bukshan Village  1.530
25 Improvement / Carpeting of street 7,8 Punjab Colony 1.680
26 Repair /Supply & fixing of 150mm dia uPVC pipe from AKhtar Colony to Matka chock (Hazara Colony) 3.300
  Total 66.450